Case Studies
Our Services
Contact
Case Study:
Kensington Palace
This historic Royal Palace, originally built in 1605 and converted into a Palace in 1689, underwent refurbishment work in 2002 that involved the upgrading of existing doorsets and wall panelling to an increased fire rating.
Main Contractor
Allenbuild
Client
The Royal Household
Sector
Restoration and Refurbishment
Value
£100k